Thursday, May 8, 2008

Paint, Trim, Floors and More - 4/1/08 thru 5/8/08

Painting begins with a primer coat.
Master bedroom primed. The primer is tinted but lighter than the final paint color.

Living room and breakfast area primed. Hardwood flooring installation underway.

Hardwood flooring in living room and dining room. Hardwood flooring will be sanded and finished with a walnut stain later.

Living room walls and ceiling primed.

Slate flooring in Mud Room and Laundry Room.

Emperador brown marble flooring from China in Powder Room.
Grout not yet installed.

Turkish amber river pebble flooring in Master Bath shower.

Master bath shower done in travertine stone tile.

Whirlpool bath in Master Bathroom.

One of two large stacks of trim to be installed.

Fireplace mantel and trim in office.

Fireplace trim for Master Bedroom installed.

Coffered ceiling installed in Living Room.

Built-in bookshelves beside firplace in Living Room.
Coffered ceiling painted. Final wall paint color cut-in on back wall.

Trim work completed in Entrance Foyer and Dining Room.

Living Room columns.

Shutters installed on garage windows.

Shutters installed on basement windows.

First of the kitchen cabinets installed.

Kitchen cabinet design/layout.