Master bedroom primed. The primer is tinted but lighter than the final paint color.
Living room and breakfast area primed. Hardwood flooring installation underway.
Living room and breakfast area primed. Hardwood flooring installation underway.
Hardwood flooring in living room and dining room. Hardwood flooring will be sanded and finished with a walnut stain later.
Living room walls and ceiling primed.
Living room walls and ceiling primed.
Slate flooring in Mud Room and Laundry Room.
Emperador brown marble flooring from China in Powder Room.
Grout not yet installed.
Grout not yet installed.
Turkish amber river pebble flooring in Master Bath shower.
Kitchen cabinet design/layout.