Wednesday, October 31, 2007
Basement floor - 9/22/07 thru 10/10/07
Basement filled and graded with gravel in preparation for concrete floor slab. Basement walls will be 20 block courses high (13'-4")
9/22/07
Foundation Construction - 8/1/07 thru 10/4/07
Footer had several stepdowns...5 foot elevation difference from back to front of basement.
8-6-07
Basement footer complete
8/6/07
Concrete blocks delivered
8/10/07
8/10/07
First block laid
8/27/07
8/27/07
First of 17 days of block work...very slow with only a two man crew.
8/27/07
Placing concrete in formwork at transition from basement to crawlspace.
9/20/07
8/27/07
Onward and upward
9/11/07
Pumper truck had a long reach
9/11/07
Two of the basement walls topped out at 21 courses.
9/11/07
Pumper truck used to place concrete in upper level footers.
9/11/07
9/20/07
9/20/07
9/20/07
Breaking Ground - 7/16/07
Cut in the entrance drive
Breaking up excavated rock
Stack the rock to make a retaining wall
Bad photo of a great view
Better photo of our great view.
Better photo of our great view.
Looking west down the Cumberland River.
Site clearing - 7/16/07
Saved two large hickory trees which will be in front of the house.
Saved as many trees as possible. Plan on not having any grass to mow! Took a load of the larger cedar logs to a local saw mill...got a whopping $78.46. Definitely not worth it.
Kept trees between us and the neighbors.