Basement filled and graded with gravel in preparation for concrete floor slab. Basement walls will be 20 block courses high (13'-4")
9/22/07
Sewer outlet pipe and water supply line inlet
10/4/07
Basement plumbing
10/4/07
Electrical supply line conduits
10/4/07
Placing concrete in area under front porch/accessway to crawlspace
10/10/07
Plastic sheet vapor barrier and rebar ready for concrete.
10/10/07
Concrete placement in basement
10/10/07
Concrete placement in basement
10/10/07
Finishing concrete floor in basement
10/10/07