Footer had several stepdowns...5 foot elevation difference from back to front of basement.
8-6-07
Basement footer complete
8/6/07
Concrete blocks delivered
8/10/07
8/10/07
First block laid
8/27/07
8/27/07
First of 17 days of block work...very slow with only a two man crew.
8/27/07
Placing concrete in formwork at transition from basement to crawlspace.
9/20/07
8/27/07
Onward and upward
9/11/07
Pumper truck had a long reach
9/11/07
Two of the basement walls topped out at 21 courses.
9/11/07
Pumper truck used to place concrete in upper level footers.
9/11/07
9/20/07
9/20/07
9/20/07