Footer had several stepdowns...5 foot elevation difference from back to front of basement.8-6-07
Basement footer complete8/6/07
Concrete blocks delivered8/10/07
First block laid8/27/07
First of 17 days of block work...very slow with only a two man crew.8/27/07
Onward and upward9/11/07
Two of the basement walls topped out at 21 courses.9/11/07
Pumper truck used to place concrete in upper level footers.9/20/07
Pumper truck had a long reach9/20/07
Placing concrete in formwork at transition from basement to crawlspace.9/20/07